Washing the top of the blocks
Pouring the walls
Pouring the walls
Pour begins!
Pour begins!
Cement truck getting into position
Pump truck getting into position
Progress being made
Lowes dropped the load
Installing the braces
Inside the rows of blocks
Pump truck positioned to pour
fireplace bracing secured
Now we add the planks to walk on
Bracing the bathroom window
Bracing the spa area windows
Bracing the spa area windows
Bracing the door to the spa area
Bracing the Tv room and utility room
Bracing the spa area
4 crates of Bracing Arrived!
Pool Area
134 foot long wall
Pool Area
Front door area
we glue the blocks down once aligned
How did I screw this up soo bad?
We laid down metal track to easily align the ICF blocks and glue them to the tracks once leveled