It took 93 loads of dirt and gravel and 22 cements trucks to get to this level!
Foundation buried and ready for ICF
Foundation buried and ready for ICF
The foundation had to be stepped in several places
pool deck retaining walls
Living room, dining room and kitchen almost filled with gravel
Water proofing retaining wall for Turkish spa area
Added water proofing to living room/kitchen//dining room retaining wall
Click here to edit your description
It took 85 trucks of crushed rock and 8 trucks of dirt to fill the retaining wall and get the driveway ready to be paved!
We need an small compactor
We need an large compactor
We need an excavator
We are starting to fill all the retaining walls with crushed gravel
The pool area is very wet because it rained holding us back by a week
Retaining walls complete!
Retaining walls complete!
Retaining walls complete! All of this has to be filled with gravel so the ground floor is level.
Pool lake side. The little retaining wall is the outside wall of the pool deck.
The retaining wall near the driveway is about 5ft deep that also needs to be filled with gravel and compacted every 2 ft.
This needs to be filled with gravel and compacted every 2 ft